LIST OF PROJECTS COMPLETED BY DSR Surveys Pvt. Ltd. 2010-2014

Topographical surveys for Teesta Low Dam-(I&II) combined and Teesta Intermediate Hydroelectric Projects in West Bengal for WAPCOS Ltd. 2010
• Obstruction survey for Oxford properties Helipad at Pune for Aero Survey/ Helitek Inc.
• Topographical, Hydrographic & Demographic Surveys for Basic Study & Detailed Project Report for Water Intake System For 6 X 660 MW Chitrangi Thermal Power Project (M.P) for WAPCOS Ltd.
• Topographical and Hydrographic for Design of Suitable Structure and Raw Water Pump House for 2460 MW Coal Based Thermal Power Plant at Sidhi (M.P) for WAPCOS Ltd.
• Topographical and Hydrographic for Area Drainage Study and Assessment of Effect Of Tilaiya Dam Break on Flooding for Proposed Tilaiya UMPP, Koderma, Jharkhand for WAPCOS Ltd.
• Topographical & Route Survey for SPM & Associated Facilities Project Of M/S MRPL/EIL at Mangalore
• Obstruction survey for New Airport at Aranmula in Kerala State for KGS Group.
• Topographical survey work and Final Location Survey for Kolkata Metro for Corridor 1:- Baranagar – Barrackpur via BT Road (10.5kms) and Corridor 3:- Dum Dum Airport – New Garia via Rajerhat (32kms) for RITES, 2010.
• Final Location Survey of Noapara-Dakhineswar Metro Corridor for CCCL/ RVNL.
• Obstruction survey of Itanagar Stolport.
• Topographical and Hydrographic for Area Drainage Study for Proposed WELSPUN Power projects at Katni and Anuppur in Madhya Pradesh for WAPCOS Ltd.
• Final location survey for construction of Railway Infrastructure to serve the proposed 4x600 MW, OPJSTPP for coal Transportation from Raigarh to Tamnar and Libra (Coal Mine) to Raigarh for Jindal Power Ltd.
• Topographical survey for Proposed for Housing Complex at Mahendergarh and Khatu Shyam for Pelican Realty Ltd. 200 Acres.
• Topographical Survey for Proposed Mass Transit connectivity between Kalyanpuri and Shashtri Park Metro Station of DSIIDC, New Delhi for RITES Ltd. 2011
• Obstruction Survey of seven airports in Chattisgarh for IACS/ Chattisgarh Government.
• Traverse validation and Topographic Surveys for Noapara-Dakhineswar Metro Corridor for CCCL/ RVNL.
• Final Location Survey and Land Survey Work for Bangalore Metro Rail Project – Phase-2 : CORRIDOR - 2: Baiyyappanahalli Station To White Field Via K R Puram and ITPL – 15.10 Km, Corridor - 3: Mysore Road Station To Kengeri – 7.70 Km for BMRCL/ RITES Ltd, for RITES, 2011.
• Engineering consultancy services for restoration of basic strip & prevention of soil erosion including feasibility studies for Runway extension at Shimla Airport - Topographic Survey for RITES Ltd.
• Topographic and River Survey for Area Drainage Study for 1320 MW Thermal Power Project at Dadri Khurd Village Mirzapur, UP for WELSPUN POWER/ WAPCOS Ltd.
• Final Location Survey & Topographic Survey For Bangalore Metro Rail Project – Phase -2 –Package -2: Corridor R-4b Ext: Puttenhalli to Anjanapura Township- 6.94 Km for BMRCL/ RITES Ltd., for RITES, 2011.
• Final Location Survey & Topographic Survey For Bangalore Metro Rail Project – Phase -2 : Corridor R6: Elevated Portion: Gottigere To Swagath Rd Cross/ Dairy Circle (8.2km) for BMRCL/ RITES Ltd. 2013.
• DGPS & TOPO Survey And Land & Property Survey For Bangalore Metro Rail Project – Phase – 2, (Package -2) Corridor R-3 Extn – Hesarghatta Cross To Biec (3.28km) for RITES, 2013.
• Site Verification and Land & Property Survey for Bangalore Metro Rail Project – Phase – 2, (Package -2) Corridor R-4b Puttenhalli Cross To Anjanapura Township (6.94)
• Topographical Survey for PET Survey for New Metro Corridors in and around Metropolitan City of Kolkata. 20Km
• Traversing, leveling and cross-section survey of BT Road from Dunlop Bridge to Barrackpore, Chiriamore in connection with construction of Metro Corridor from Baranagar to Barrackpore for RVNL.12km
• Topographic Survey at Chitrakoot Airport, UP for RITES Ltd.
• Obstruction survey of Kannur International Airport.
• Topographic and Obstruction Survey for Proposed New Airport at Bhiwadi.
• Topographical using DGPS, Total Station, Auto Level, Hypack Max or similar hydrography software and preparation of drawings using mapping software for KOCHI METRO RAIL PROJECT - PHASE-2, for RITES, 2014.
• Topographical Survey using DGPS, Total Station, Auto Level and preparation of drawings using mapping software for Patna Metro Rail Project. for RITES, 2014
• Topographic survey and Leveling work for (i) Upgradation of ICD at Dadri (Uttar Pradesh) & (ii) Provision of additional spur at GGSR, Bathinda (Pb) (Two Locations) for RITES, 2014
• Topographic survey of proposed site of Multi modal Logistics Park at Kila Raipur, Ludhiana, Punjab for RITES/ M/s Punjab Logistics Infra Ltd. for RITES, 2014
• Topographical Survey Works for DCU at Barauni Refinery of IOCL. EIL/ IOCL, 2014